industrial engineering../

Zamknięty Opublikowano 6 lat temu Płatność przy odbiorze
Zamknięty Płatność przy odbiorze

Complete below and produce ONE report to include [url removed, login to view] 1. Using IDEF0methodology, draw a complete model to specify anorganizationof your choice(industrial, service, or public). This model should specify the organization down to its 2ndlevel of decomposition (i.e., include function blocks at the Axx level), taking into consideration of all the aspects such as outlined below:Follow strictly the cross-checking steps to ensure the integrity of your model:[url removed, login to view] Cross-Checka function block: for each of the Inputs, cross-check for its related Output(s); for each of the Outputs, cross-check for its related Input(s); for each of the Mechanism and Control, check what it is used [url removed, login to view], if needed, to 3-5 next level functions. For each of these sub-level functions:Carry out theSpecify and Cross-Checkas outlined in (1) Establish relationshipsamongst these functions through flow of Inputs, Outputs, Controls and Mechanisms Cross-Check Integrity of Decomposition: lower-level definition should represent EXACTLY its higher level [url removed, login to view] step 2until the required level of detail is [url removed, login to view] should provide a textual description of the overall system/organization of concern, as well as for each of the function blocks presented in the [url removed, login to view] 2. From your IDEF model of the organization, pick up two relatedfunctions. Draw an Activity-Cycle-Diagram to illustrate how the dynamic interaction takes place. PART 3. Explain, with flowchart if necessary, how simulation process can be logically carried out to estimate the system performance in terms of average lead time, and/or average resources [url removed, login to view], for the ACD model of Part 2:Assign time elements involved (such the average and distribution times of arrival, and machining/process/service times)Carry out a simulation, physically, and estimatethe values related to system performance such as the mean throughput and/or the average waiting [url removed, login to view] and Structure: No more than 20pages (1.5 spacing and including figures). Please properly “section” your report, so that it follows the format of a typical technical report.

Inżynieria Inżynieria przemysłowa

Numer ID Projektu: #16570975

O projekcie

1 oferta Zdalny projekt Aktywny 5 lat temu