W Toku

Applied math - Optimization (analytical)

Background:

This work aim is to minimize operational costs, equipment cost and to short payback period of investment (analytically).

Scope of work:

1. Analytically solve the model (marked with yellow), which means to show which optimal S1 and S2 minimize the PBP while taking in consideration the constraint. If it is required- show convexity, linearity and infinity of the functions.

2. Analytically show and explain in which scenarios of minimum PBP: S1<S2, S1>S2, S1=S2.*

3. Optional (or should be priced separately): To write MATLAB code for demonstrating by sensitivity analysis both operational and capacity planning stages

*More details are provided in the files

Umiejętności: Matematyka, Matlab i Mathematica

Zobacz więcej: minimum multiple in math, freelance applied math, applied optimization with matlab programming, applied math tutorials, applied math freelancing, math optimization, applied optimization problems, applied math projects, applied math instrumentation automation, applied math statistics, math coordinator, good math coordinator, informative math articles, vba optimization, oscommerce full optional

O pracodawcy:
( 0 ocen ) Tel Aviv, Israel

Numer ID Projektu: #11843811

8 freelancers are bidding on average $225 for this job

VolKa

Hi. I'v read the descrption and sure will be able to manage to this. Also I am good in Matlab and can do the third part of the project. Regards

$250 USD w ciągu 6 dni
(159 Ocen)
6.4
$222 USD w ciągu 10 dni
(28 Ocen)
5.5
TellezMiotta

Hi! My name is Fernando Téllez. I am a senior year student of electrical engineering at Universidad Simón Bolívar (USB), one of the most prestigious universities in my country (Ranked 34° at the QS University Rankings: Więcej

$160 USD w ciągu 1 dnia
(41 Ocen)
5.6
antonparfeniuk

A proposal has not yet been provided

$500 USD w ciągu 3 dni
(50 Ocen)
5.1
ardiles1309

I am a chemical engineer with broad experience in mathematical modeling, simulation and optimization for chemical or manufacturing facilities. I can help with your problem. Regards

$300 USD w ciągu 3 dni
(3 Ocen)
3.4
$155 USD w ciągu 3 dni
(1 Ocena)
1.0
abhilashrox

I am a PhD student at the Mathematical Institue at NMBU, norway. I am working with Gene regulatory networks and optimised control algorithms. Your jobs seems to be an easy task. Let me know if you are interested Więcej

$155 USD w ciągu 3 dni
(1 Ocena)
0.6
$55 USD w ciągu 3 dni
(0 Ocen)
0.0